Fast Tracked Concept Based on DSM Model
| Author(s) | : | Shrenik G Sohaliya, Mr.Vikas D Bhavsar |
| Institution | : | Student, M.E. Infrastructure Engineering,LDRP Institute of Technology and Research, Gandhinagar-382015, Gujarat, India |
| Published In | : | Vol. 2, Issue 5 — May 2015 |
| Page No. | : | 126-132 |
| Domain | : | Engineering |
| Type | : | Research Paper |
| ISSN (Online) | : | 2348-4470 |
| ISSN (Print) | : | 2348-6406 |
The purpose of Fast track project management technique is done to reduce the project time by overlapping theproject design and construction phases and thereby by making maximum possible activities run parallel to each other soas to reduce the time. The main aim is to study of fast tracking process of a real estate project. And to evolve fasttracking model based on dependency structure matrix. As engineering activities are interdependent and sequenced basedon information flows, modeling information exchange for these activities is impossible with CPM or PERT. Researcherhave investigated the dependency structure matrix as a tool to identify and manage information exchange betweenactivities. In the Ahmedabad city, most of the mega infrastructure project are delay due to some technical or financialreason. So that, there are major losses in time and project cannot complete within its time period. For these project, timeis real money. So, fast tracking is one of the appropriate options to take project on its proper track. Thus, DSM is veryimportant model to fast track project at any panic Situation. It has also used prediction model to calculate rework ofdays for succeeding activity.
Shrenik G Sohaliya, Mr.Vikas D Bhavsar, “Fast Tracked Concept Based on DSM Model”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 2, Issue 5, pp. 126-132, May 2015.