OPTIMIZING & ANALYZING OVERALL EQUIPMENT EFFECTIVENESS THROUGH TPM APPROACH: A CASE STUDY IN CEMENT INDUSTRY
| Author(s) | : | MEET LALKIYA, DEEPAK KUMAR KUSHWAHA |
| Institution | : | PG Student, Gujarat Technological University Ahmedabad, India |
| Published In | : | Vol. 2, Issue 5 — May 2015 |
| Page No. | : | 807-811 |
| Domain | : | Engineering |
| Type | : | Research Paper |
| ISSN (Online) | : | 2348-4470 |
| ISSN (Print) | : | 2348-6406 |
Continuous availability of reliable sophisticated equipment with precision is need of the competitive market.Overall equipment effectiveness (OEE) is important measurement tool for equipment effectiveness. An attempt has beendone to measure and analyze existing overall equipment effectiveness of machinery producing pozolona portland cement.Which is used in construction work. By measuring the performance of existing system, reference values are obtained fordesign of experiments. By using Minitab 16 software an experimentation has been done on three factors and two level ofOEE. Main effect plots and regression analysis provide information about which is most influencing factor and classicrelationship between availability, performance rate and quality rate. Significance of each factor is indicted by P-valuesin the given analysis. Finally counter plots and response surface method results in to optimized value of three factors ofOEE. Simulated values of the output will be useful information to industry.
MEET LALKIYA, DEEPAK KUMAR KUSHWAHA, “OPTIMIZING & ANALYZING OVERALL EQUIPMENT EFFECTIVENESS THROUGH TPM APPROACH: A CASE STUDY IN CEMENT INDUSTRY”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 2, Issue 5, pp. 807-811, May 2015.








