🕔 Call For Paper — Vol. 13 | Issue 7 | July 2026 | Deadline: 31-Jul-2026
Track Paper Submit Paper Home
📢 NOTICE
đŸ“¢ Call for Papers — Volume 13, Issue 7 (July 2026) | Submission Deadline: July 31, 2026 | Rapid peer review: 2–3 days | Impact Factor: 7.37 (SJIF 2026)

Paper Details

📄 IJAERD-OJS-2150

Redevelopment and Up gradation of Basic Infrastructural Facility at Tithal Village of Valsad District

Author(s):Alpesh R. Patel, Kuldip B. Patel, Chintan R. Patel
Institution:U.G. Student, Civil Engineering Department, Government Engineering College, Valsad, India
Published In:Vol. 5, Issue 1 — January 2018
Page No.:348-351
Domain:Engineering
Type:Research Paper
ISSN (Online):2348-4470
ISSN (Print):2348-6406
Abstract

In many fields, but still much is needed to be done in order to become developed nation. Statistics betrays thatafter independence our growth rate has increased from 3% to 9%.but still we are facing some problem. The millenniumdevelopment goals in india has set a target of reducing, poverty by 50% of what it was in last 20 years. While the proportionof the people living below the poverty line has been declining over the years. The rate of such decline has been quite low,except during the recent past. Nearly 80 percent of the people living below the poverty line are located in rural areas. Indiabecame independent on 15 august 1947. Though after independence achieved tremendous success problems like poverty,illiteracy, lack of basic need like water supply, sanitation and road system etc. besides; a major chunk of population livingin villages, (72%) is still backward. Though the government is spending million of rupees in the name of rural development,but still it’s not getting the desired results.The development of rural development is implementing a number of programs in rural areas through the state governmentsfor poverty reduction, employment generation, rural infrastructure habitant’s development, provision of basic minimumservices.The Research goal is to find out present status and techno-economic survey of village in terms of basic and publicamenities, essential commodities, other infrastructural facilities for the need of people and to prepare reports on theadequacy of the available resource with reference to the population of the village and growth of the area. With theconsultation of local revenue authorities, TDO and DDO the future need of the village, keeping to mind the need of thedays, future targeted population growth etc, a projected development plan of the village ready to execute is required to beprepared under this Reserch as targeted at the end.In this Research work was carried out on Tithal village of Valsad district for the existing available infrastructure facilitiesand future infrastructure facilities need assessment with population growth for human being. In this a local survey of Tithalvillage was carried out and problem related infrastructure facilities like water supply, road network, drainage line,community hall, renewable energy resources structures and street light, etc, was find out. After that planning, designingand cost estimation of most need based eco friendly infrastructure facilities with green technology was prepared.

🗎 Download PDF 🏆 Get Certificate
🕮 How to Cite

Alpesh R. Patel, Kuldip B. Patel, Chintan R. Patel, “Redevelopment and Up gradation of Basic Infrastructural Facility at Tithal Village of Valsad District”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 5, Issue 1, pp. 348-351, January 2018.

Related Papers

📄 Submit Your Paper

Open Access • Peer Reviewed • CrossRef DOI
UGC Approved • Monthly Publication

Submit Now →
📅 Submission Deadline
31 Jul 2026
Vol. 13 | Issue 7
July 2026