🕔 Call For Paper — Vol. 13 | Issue 7 | July 2026 | Deadline: 31-Jul-2026
Track Paper Submit Paper Home
📢 NOTICE
📢 Call for Papers — Volume 13, Issue 7 (July 2026) | Submission Deadline: July 31, 2026 | Rapid peer review: 2–3 days | Impact Factor: 7.37 (SJIF 2026)

Paper Details

📄 IJAERD-OJS-2151

QUALITY CONTROL CONSIDERATIONS FOR FLEXIBLE PAVEMENTSBEFORE CONSTRUCTION

Author(s):Mehnaza Akhter
Institution:Department of Civil Engineering, NIT Srinagar, J&K, India
Published In:Vol. 5, Issue 1 — January 2018
Page No.:352-358
Domain:Engineering
Type:Research Paper
ISSN (Online):2348-4470
ISSN (Print):2348-6406
Abstract

Quality assurance is the planned and systematic actions necessary to provide adequate confidence that the work issatisfying all the quality requirements. Thus, the quality control system includes all those planned actions that are necessaryto provide adequate confidence that the products or service will meet the requirements and is essentially a system ofplanning, organizing. and controlling human skills to assure quality. The quality control involves the acceptance criteriawhich includes the tests, frequency of testing and tolerance limits, inspections for critical examination of the work by selectedtests to determine its conformity to specifications and action taken to ensure quality. In the existing system, the qualitycontrol tests are carried out at the three different levels; before, during and after construction. In the present paper someeffective ways to ensure quality control before the construction of flexible pavements is studied.

🗎 Download PDF 🏆 Get Certificate
🕮 How to Cite

Mehnaza Akhter, “QUALITY CONTROL CONSIDERATIONS FOR FLEXIBLE PAVEMENTSBEFORE CONSTRUCTION”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 5, Issue 1, pp. 352-358, January 2018.

Related Papers

📄 Submit Your Paper

Open Access • Peer Reviewed • CrossRef DOI
UGC Approved • Monthly Publication

Submit Now →
📅 Submission Deadline
31 Jul 2026
Vol. 13 | Issue 7
July 2026