Investigating delay in construction projects
| Author(s) | : | Jilsha shirin P, Prof .Ciby Thomas |
| Institution | : | Industrial Engineering and Management, RIT Pampady |
| Published In | : | Vol. 6, Issue 11 — November 2019 |
| Page No. | : | 59-68 |
| Domain | : | Engineering |
| Type | : | Research Paper |
| ISSN (Online) | : | 2348-4470 |
| ISSN (Print) | : | 2348-6406 |
Delay is one of the greatest issues that many structures in India are facing. Timely completion of projects isthe main component of the project, but the construction method is subject to many variables and unpredictable factors,which are the cause of delay due to many sources such as resource accessibility, external factors, party performance anddesign and material type Project delay contributes to loss of productivity, enhanced price, termination of contracts andconflicts. The objective of this project is to explore the causes and impacts of delay on construction projects during theconstruction stage and to provide control measures for delay in the projects. A research is conducted on delays in thebuilding timetable and multiple delay analyses to assess the causes of the delay and its impact in the project. Aquestionnaire study is then carried out to determine the main causes of delay experienced by clients, contractors,consultants and project managers. Sample population of 250 has been used. From the survey and research, 44 causes ofdelay were recognized in 8 main organizations such as Owner, Contractor, Consultant, Project, Material, Labor,Government, Equipment and Factors External. Then a model was created and tested to evaluate the construction delayand lastly make suggestions to regulate the construction delay.
Jilsha shirin P, Prof .Ciby Thomas, “Investigating delay in construction projects”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 6, Issue 11, pp. 59-68, November 2019.