ANALYSING OF DELAY FACTORS IN MULTISTOREY BUILDINGS

Authors

  • Praburaj.S P.Gstudent, Department of Civil Engineering, Gnanamani college of engineering-Namakkal, Tamil Nadu, India
  • Janagan.S.S Assistant professor,Department of Civil Engineering, Gnanamani college of engineering-Namakkal, Tamil Nadu, India
  • Saravanakumar.K Assistant professor, Department of Civil Engineering, Gnanamani college of engineering-Namakkal, Tamil Nadu, India

Keywords:

delayfactors, Questionnaire survey, Relative important index, rank

Abstract

Today in construction industry several challenges are faced by construction projects. Many of them directly
affect the construction operation concluding the delay in project or affecting the performance of project. This delay
negatively affects economy, growth of infrastructure and the society at large. To improve performance of project it is
important to study the delay factors which affect the success of project. The purpose of this study is to logically explore the
delay factors of project and how these can be avoided or controlled.This research mainly focuses on identifyingthe delay
factors in construction. From literature review the main delay factors of construction is identify. A questionnaire survey is
to be carried out in various multistory building projects and rank them by Relative Importance Index. Using that data’s the
major delay factors have to be identified. Finally from the results suitable suggestions was given to the companies for
reducing their delays .

Published

2018-03-25

How to Cite

Praburaj.S, Janagan.S.S, & Saravanakumar.K. (2018). ANALYSING OF DELAY FACTORS IN MULTISTOREY BUILDINGS. International Journal of Advance Engineering and Research Development (IJAERD), 5(3), 1420–1427. Retrieved from https://ijaerd.org/index.php/IJAERD/article/view/2941