CORRECTION IN THUMB RULE FOR SANITARY AND WATER SUPPLY AND ELECTRICAL COST IN MODERN CONSTRUCTION PROJECTS

Authors

  • Suresh C. Jain Associate professor, Civil Engineering Department, ITM Universe, Vadodara, Gujarat, India
  • Nishith A. Kakadiya U.G. student, Civil Engineering Department, ITM Universe, Vadodara, Gujarat, India
  • Rahul S. Dhameliya U.G. student, Civil Engineering Department, ITM Universe, Vadodara, Gujarat, India
  • Kaushal J. Badreshiya U.G. student, Civil Engineering Department, ITM Universe, Vadodara, Gujarat, India
  • Satish H. Lakkad U.G. student, Civil Engineering Department, ITM Universe, Vadodara, Gujarat, India

Keywords:

Architecture Plan, Building Estimation, Electrical Cost, Plumbing Cost, Estimated Project Cost

Abstract

As communities and regulators place build up demand on maintaining and make better infrastructure in cost
effective and socially acceptable ways, there is an improved trend in the development and usage of technologies to
provide the alternate solutions with advancement of technology.Therefore, this research aims to determine the
percentage of Sanitary and Water Supply and Electrification cost with respect to the total percentage of the project cost
by the collection of drawings of plans by consulting various architectures. We have done the market survey for current
rate determination and evaluated quantities to prepare “Abstract and Measurement” sheet, for exact percentage as on
date. The empirical relations prevailing today are getting modified in our study.

Published

2018-03-25

How to Cite

Suresh C. Jain, Nishith A. Kakadiya, Rahul S. Dhameliya, Kaushal J. Badreshiya, & Satish H. Lakkad. (2018). CORRECTION IN THUMB RULE FOR SANITARY AND WATER SUPPLY AND ELECTRICAL COST IN MODERN CONSTRUCTION PROJECTS. International Journal of Advance Engineering and Research Development (IJAERD), 5(3), 4128–1437. Retrieved from https://ijaerd.org/index.php/IJAERD/article/view/2942