Repair and Rehabilitation of Concrete structure RCC Column Jacketing: a real time technique

Authors

  • Vatsal Kulkarni UG Student,Civil Engineering Department, ITM Universe, Vadodara
  • Asst. Prof. Mihir Shah Asst. Prof. Civil Engineering Department, ITM Universe, Vadodara
  • Mr. Jayant Sheth Structural Engineer, Struct-Mast Engineer, Mumbai

Keywords:

column jacketing, repair, rehabilitation, industrial building, structural stability

Abstract

A building once constructed need time to time repair and rehabilitation. Once the lifespan of the structure is
completed it required to inspect and at the end structure stability is required. Instead of demolition and re-construction if
we can inspect in such a way and proper repair techniques applied which can be useful to regain its original strength
and in working condition it can be. An industrial building which is in Panvel, Mumbai has already completed the
lifespan for the said purpose and it required detailed inspection. It is done by the team of engineers and repair
techniques applied anlayitically, for the same column jacketing technique also applied for the construction of the slab at
site. at the end of the repair work the structure is in working condition.

Published

2022-08-23

How to Cite

Vatsal Kulkarni, Asst. Prof. Mihir Shah, & Mr. Jayant Sheth. (2022). Repair and Rehabilitation of Concrete structure RCC Column Jacketing: a real time technique. International Journal of Advance Engineering and Research Development (IJAERD), 6(13), -. Retrieved from https://ijaerd.org/index.php/IJAERD/article/view/6422