TOTAL PRODUVCTIVE MAINTENANCE IMPLEMENTATION THROUGH DIFFERENT STRATEGIES: A REVIEW
| Author(s) | : | Parth N Chandegra, Prof. Vivek A. Deshpande |
| Institution | : | PG Student, GH Patel College of Engineering& Technology, V. V. Nagar, Anad, Gujarat, INDIA |
| Published In | : | Vol. 1, Issue 11 — November 2014 |
| Page No. | : | 117-128 |
| Domain | : | Engineering |
| Type | : | Research Paper |
| ISSN (Online) | : | 2348-4470 |
| ISSN (Print) | : | 2348-6406 |
Competitive pressures and changing production management paradigms have, in recent years, increased theimportance of reliable and consistent production equipment. Whatever the level of competition exists in manufacturingindustry the performance greatly affects the survival and prolong life time in industrial scenario.In measuring the corresponding level of performance of a particular organization, the term “productivity ” becomesvital. the combination of these maintenance practices; called as maintenance function would optimize performance of theapplied productivity improvement strategy .Since maintenance also has a strategic dimension, its performancemeasurement system should be linked to the espoused strategy of the function in order to get the maximum impact.With regards to Total Productive Maintenance (TPM) implementation, Indian manufacturing organizations have oftenbeen plagued with teething problems and challenges.The developed working system and new responsibilities is explained through Autonomous Maintenance (AM), PreventiveMaintenance (PM), and 5S Modeling, with a suggestion for additional working performance indicators.
Parth N Chandegra, Prof. Vivek A. Deshpande, “TOTAL PRODUVCTIVE MAINTENANCE IMPLEMENTATION THROUGH DIFFERENT STRATEGIES: A REVIEW”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 1, Issue 11, pp. 117-128, November 2014.








