REDUCTION IN THROUGHPUT TIME OF PROPELLER SHAFT ASSEMBLY
| Author(s) | : | Yash Kamble, Akshay Thorat, Rahul Pawar, Ashwin Chandrashekhar, Prof. C. R. Patil |
| Institution | : | Sandip Foundation’s Sandip Institute of Engineering and Management, Nashik, Maharashtra, India |
| Published In | : | Vol. 5, Issue 5 — May 2018 |
| Page No. | : | 178-184 |
| Domain | : | Engineering |
| Type | : | Research Paper |
| ISSN (Online) | : | 2348-4470 |
| ISSN (Print) | : | 2348-6406 |
Integration of machining operation is mandatory in order to achieve desired manufacturing cost and time. Itincludes improvement of tooling devices. It includes fixtures which help in locating clamps and supporting workpieces.They play an important role in integration of operations. This project includes manufacturing of half end yoke which is apart of universal joint. This aim gives rise to need of modifying the fixture due to its incapability towards integration ofoperations. The primary objective of the project is to develop a fixture such that is will serve its functions and allow theintegrated operations to be performed so as to reduce the throughput time for propeller shaft. The fixture was designedon basis of three principles namely location, support and clamping. The foremost concern during the designing phasewas that its operation should be easy and comfortable for the operator. After the design and manufacturing and design offixture it was put to test. The results of the test and inspections were positive. The design had several advantages but italso gave rise to some of the limitations. There is a scope to overcome these limitations in future by improving on design.
Yash Kamble, Akshay Thorat, Rahul Pawar, Ashwin Chandrashekhar, Prof. C. R. Patil, “REDUCTION IN THROUGHPUT TIME OF PROPELLER SHAFT ASSEMBLY”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 5, Issue 5, pp. 178-184, May 2018.