FUZZY NETWORK PROBLEMS USING JOB SEQUENCING TECHNIQUE IN HEXAGONAL FUZZY NUMBERS
| Author(s) | : | K.Selvakumar, G.Sowmiya |
| Institution | : | Assistant Professor, Department of Mathematics, Vels University, Chennai, Tamil Nadu,India |
| Published In | : | Vol. 4, Issue 9 — September 2017 |
| Page No. | : | 116-121 |
| Domain | : | Engineering |
| Type | : | Research Paper |
| ISSN (Online) | : | 2348-4470 |
| ISSN (Print) | : | 2348-6406 |
The critical path problem is a classical and important network optimization problem appearing in manyapplications. This paper presents a method for finding critical path in the fuzzy project network. A fuzzy network problem canbe easily solved by job sequencing technique. In fuzzy project network, when the duration time of each activity represented bya hexagonal fuzzy number. In this paper, finding fuzzy shortest path in the network using Pascal’s triangle graded meanintegration for duration time can be converted into crisp value, we solve the problem and obtained the (n-1) sub sequence ofthe route using the proposed algorithm, we calculate the optimal sequence which leads to the shortest path of the network.
K.Selvakumar, G.Sowmiya, “FUZZY NETWORK PROBLEMS USING JOB SEQUENCING TECHNIQUE IN HEXAGONAL FUZZY NUMBERS”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 4, Issue 9, pp. 116-121, September 2017.








