🕔 Call For Paper — Vol. 13 | Issue 9 | September 2026 | Deadline: 27-Sep-2026
Track Paper Submit Paper Home
📢 NOTICE
DOI will be assigned to every published paper at no additional charge. 📢 Call for Papers — Volume 13, Issue 9 (September 2026) | Submission Deadline: September 30, 2026 | Rapid peer review: 2–3 days | Impact Factor: 7.37 (SJIF 2026)

Paper Details

📄 IJAERD-OJS-5577

A STUDY ON EFFECT OF METRO RAIL WORK ZONE ON TRAFFIC FLOW PARAMETERS IN URBAN AREA - A CASE STUDY OF CHANDKHEDA STRETCH IN AHMEDABAD CITY

Author(s):Dhavalkumar D Chavda, Dr. N.G Raval
Institution:M.E Student,Civil Engineering Department, Government Engineering College,Modasa
Published In:Vol. 5, Issue 4 — April 2018
Page No.:745-751
Domain:Engineering
Type:Research Paper
ISSN (Online):2348-4470
ISSN (Print):2348-6406
Abstract

Metro rail project implementation includes way to the construction activities.In this process, long termconstruction work zones are inevitable. Long term work zones on urban roads lead to many problems such as reductionin space mean speed, reduction in traffic flow, increase in density, increase in delay etc. It becomes necessary to studyand quantify the impact of Metro rail construction work zones on traffic flow parameters. The present research aims tostudy the impact of Metro rail construction work zones on traffic flow parameters and consequently quantify theseimpacts for present situation. Using videography techniques, space mean speed, flow and density are determined in workzone and non work zone conditions and compared. With such impacts, it becomes imperative to have traffic managementtechniques and systematic work zone scheduling so as to reduce the impacts of metro rail construction work zones. Thepresent study will helpful for planning during implementation of Metro rail project or similar long term project to theurban authority.

🗎 Download PDF 🏆 Get Certificate
🕮 How to Cite

Dhavalkumar D Chavda, Dr. N.G Raval, “A STUDY ON EFFECT OF METRO RAIL WORK ZONE ON TRAFFIC FLOW PARAMETERS IN URBAN AREA - A CASE STUDY OF CHANDKHEDA STRETCH IN AHMEDABAD CITY”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 5, Issue 4, pp. 745-751, April 2018.

Related Papers

📄 Submit Your Paper

Open Access • Peer Reviewed • CrossRef DOI
UGC Approved • Monthly Publication

Submit Now →
📅 Submission Deadline
27 Sep 2026
Vol. 13 | Issue 9
September 2026