📄 IJAERD-OJS-6354

Working Out The Quantities of Civil Engineering Structures

Author(s):Rokade Pranit S, Shete Siddhesh B, Sarwade O. P, Chakave Pratik S, Gawade Shubham P
Institution:Civil Engineering, Jaihind Polytechnic, Kuran
Published In:Vol. 5, Issue 16 — January 2018
Page No.:-
Domain:Engineering
Type:Research Paper
ISSN (Online):2348-4470
ISSN (Print):2348-6406
Abstract

Cost estimation is the most important preliminary process in any construction project. Therefore, construction costestimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studiedproposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied amethodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sourcesfor the surveyed proposals.The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have beenset. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction costestimation factors have been used? From the results of this survey, two main contributions have been produced. The first contributionis the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation.The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimedultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of ourcontributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

🗎 Download PDF 🏆 Get Certificate
🕮 How to Cite

Rokade Pranit S, Shete Siddhesh B, Sarwade O. P, Chakave Pratik S, Gawade Shubham P, “Working Out The Quantities of Civil Engineering Structures”, International Journal of Advance Engineering and Research Development (IJAERD), Vol. 5, Issue 16, pp. -, January 2018.

Related Papers

📄 Submit Your Paper

Open Access • Peer Reviewed • CrossRef DOI
UGC Approved • Monthly Publication

Submit Now →
📅 Submission Deadline
27 Sep 2026
Vol. 13 | Issue 9
September 2026